Reconsrtruction of local treatment plant on Kyiv brewery plant “Carlsberg Ukraine”

Reconsrtruction of local treatment plant on Kyiv brewery plant “Carlsberg Ukraine”
 
The works of reconstruction of industrial waste water treatment plant according to the project “Local wastewater treatment plant” on Kiev brewery «Carlsberg Ukraine» located on Chervonopraporna str., 137 in Kyiv.   
In cooperation with ENVIRO-CHEMIE GmbH, Germany there was implemented installation and adjustment works of equipment Вiomar ASBx. Present technology allows to achieve environmental standards with maximum economic efficiency. It is characterized by high productivity under condition of presence of substances in the water that are well utilized by biological means.     
 
Realized works:
  • Dismantle of existing equalizer set (metal tank capacity 2000 m3).
  • Foundation building of digester Вiomar ASBx  0910СС01 (installation of the foundation piles for the tank of capacity 2500  m3). The foundation area is 160 m2.
  • Civil engineering works on the installation of anaerobic treatment facility.
  • Civil engineering works on digester extension. 
  • Arranging the site for unloading sludge container.
  • Arranging the flyover.
  • Constructions protection.
  • Protection of coarse floor.
  • Preparation works for lagoons protection.
  • Arranging lining of lagoon block (lining with polypropylene sheet of metal tanks with space area of 1500 m2).
  • Laying of underground and aboveground pipelines.
  • Arranging the ventilation system. 

 